Project:
N524JL/N87JL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (206)
Research
- (2)
-
Practice Kit(ordered)
-
Years of.......
Workshop
- (7)
-
Back on track
-
BIG DAY!!!!!!
-
Hangar issues and a...
-
Workshop ready
-
Two more small tables
-
Purchased and built...
-
MDF Tops/Saw
Empennage
- (51)
-
Rolled LE and FINISH
-
Attached trim tab
-
Trim tab assembly...
-
Closing up the left...
-
Left elevator riblet...
-
Right elevator complete
-
*****Right elevator...
-
Right elevator...
-
Bending the elevators
-
Elevator trim...
-
Elevator stiffeners
-
Rolling the rudder...
-
Trailing edge time
-
Rudder skins on
-
Rivet the rudder...
-
New TE wedge in
-
The TE...
-
Rudder counterweight
-
Getting ready for...
-
Rudder...
-
Beveled...
-
Rudder cont
-
Began the rudder...
-
Rudder stiffeners...
-
Beginning rudder
-
Vertical stabilizer...
-
Vert ribs
-
Vert spar
-
VERT CONT
-
Starting the...
-
Finished the...
-
Front spar and left...
-
No going...
-
Dirty hands…
-
New tool
-
Hole enlarged/response
-
Drill...
-
VA146 bearing
-
HS00005&HS00006
-
First look at a...
-
Flange tool
-
HS 714-710 bend&...
-
702 Cont
-
......702 notch...
-
Ok, so here it...
-
Transition to the...
-
Rear spar
-
Inventory time
-
It arrived!!
-
Official owner
-
EMPENNAGE ORDERED
Wings
- (57)
-
Push pull tubes...
-
Push pull tubes
-
Flap hinge work and...
-
Ailerons and flaps...
-
Weld aileron rods
-
Flaps started
-
Ailerons complete
-
Drilled/dimpled...
-
Riveting the ailerons
-
Begin ailerons
-
Roll Servo mount
-
Aileron brackets...
-
Pitot mast&tube...
-
Placed right wing in...
-
Left wing complete(ish)
-
Right wing begins
-
Left aileron&...
-
Right tank finished...
-
Left tank leak...
-
Left tank complete
-
Fuel tanks start of...
-
Countersink...
-
Left leading edge...
-
Upgraded rudder...
-
Repeat for the right...
-
Fuel flange and drain
-
Tank access panel
-
Tank attach brackets
-
Tank/ baffle...
-
Stiffeners&Z...
-
Tank...
-
Fuel tank mock up/fit
-
Leading edge cradle...
-
Wing jig built /...
-
Conduit supports...
-
Main ribs riveted
-
Wing wire conduit fab
-
Ribs complete
-
Uggghhhhhhhh
-
THE RIBS
-
Aileron spars complete
-
Spar doublers...
-
Aileron spar...
-
Finish tie down and...
-
Tie down bracket cont'd
-
Tie down fabrication
-
K1000-4 platenuts...
-
Countersink/prime/ac...
-
Tank attach nut plates
-
Inventory…...
-
WINGS ARE HERE!
-
Countersinking tips...
-
Wing tip continued work
-
Started making...
-
Zip Tips arrived!!
-
Email from Damien at...
-
Wings ordered
Fuselage
- (64)
-
HS fairing tap
-
Had to set the pedal...
-
Drilled roll bar to...
-
In case you didn't...
-
Aileron trim bracket
-
Vertical Stab attach
-
Elevator pushrod
-
HS drill and install.
-
Static port install
-
Back at...
-
Brake lines
-
Sub panel
-
Foreword deck mock-up
-
Gear weldments
-
Completed flap...
-
Flaps
-
Began covers in the...
-
Seats completed
-
Baggage bulkhead...
-
Braided teflon brake...
-
Tunnel cover pieces
-
Seat hinges
-
Side steps
-
Gussets and top skins
-
Seatbelt anchors
-
695 gussets complete
-
Began positioning...
-
F-757 Gusset and...
-
Riveted aft deck
-
Aft deck
-
FLIPPED THE CANOE
-
Finished fuselage...
-
3M Firewall sealant...
-
Began riveting side...
-
Beginning to rivet fuse
-
Completed fuselage...
-
Completed fabrication
-
Rudder pedals...
-
Upgraded rudder pedals
-
Tank attach bracket...
-
F684 gusset and...
-
Finish kit inventory...
-
Auxiliary and lower...
-
Build selfie ;)
-
Gear weldmant...
-
Straps
-
Fuselage work continued
-
Began fitting firewall
-
Finish kit arrived!
-
Bending conical bend...
-
Center section and aft
-
*PHONE AND BUILD...
-
706 bulkhead...
-
706 bulkhead
-
Rudder block
-
705 bulkhead rivet...
-
705 bulkhead
-
705 Bulkhead begin
-
Completed center...
-
Firewall complete
-
Began spar center...
-
Fuselage started!...
-
Annnddd the arduous...
-
Fuselage kit has...
Canopy
- (1)
-
Began canopy-roll bar
Controls
Firewall Forewar
Engine/Cowling
- (2)
-
James...
-
Engine ordered
Fuel System
Propeller
- (1)
-
Propeller ordered
Instrument Panel
- (6)
-
Started fabricating...
-
Panel inserts
-
Vinyl Wrap swatches
-
Custom Switches
-
Panel lay out
-
The carbon panel...
Avionics
- (5)
-
Installed GSA28...
-
Avionics...
-
Rest of my avionics...
-
Wire purchase
-
Bulk of avionics...
Lighting
Landing Gear
Interior Finish
Paint / Decals
Inspection
Tools
- (7)
-
Rivet the left...
-
Avionic tools in...
-
Longeron yoke
-
Die and bit holder
-
More tools purchased
-
Bought a 29 gallon...
-
Cleveland Tools...
Practice
- (2)
-
Practice kits finished
-
Practice kit arrived
Service B’s
- (1)
-
Did SB00036
Builder Name:
Jeremy Leonard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1074
Total Flight Time:
Start/Last Date:
Mar 17, 2021 - No Finish Date
Engine:
Lycoming IO360M1B
Propeller:
Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:
Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
Friendly URL:
https://eaabuilderslog.org?s=N524JL/N87JL
Home or Last Project Picture
Jan 23, 2023
Annnddd the arduous inventory has begun
Category: Fuselage
As it says, inventory begins. Ugghhh
401A5082-AD89-4183-A1D0-2ABAC78E7EF9.jpeg
69F20134-AA67-477D-ACB8-6066D3B85363.jpeg
DC9CD124-1FA4-4915-8BC0-6350FEE9CBAC.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.